Bespoke New-Build Home

From a blank plot through the construction stages.
ASUKA247 delivered the build through major excavation, double-basement construction, reinforced concrete works, damp proofing and waterproofing, new utility mains from the road, superstructure, external envelope and internal fit-out.

Exterior hero image: architectural concept visualisation, not a photograph of completed works.

Double Basement
Reinforced Concrete
Damp Proofing
Gas • Electricity • Water
Complete Build & Fit-Out

A documented construction journey

Follow site clearance, double-basement construction, waterproofing, structure, services and fit-out. Exterior concept visualisations show the intended finished appearance and are not photographs of completed works.

01
01 Blank Plot

01 Blank Plot

Work began with a blank piece of land, establishing the starting point for the bespoke new-build project.

02
02 Site Clearance & Muck Away

02 Site Clearance & Muck Away

Site clearance, access preparation and removal of excavated material prepared the plot for major groundworks.

03
03 Double Basement / Waterproofing

03 Double Basement / Waterproofing

Major excavation formed the double-basement footprint. Below-ground waterproofing and damp-proof protection were incorporated as the basement works progressed.

04
04 Basement Structure

04 Basement Structure

Reinforced concrete basement walls, slabs and structural elements were formed using temporary works, formwork and propping.

05
05 Reinforced Concrete & Propping

05 Reinforced Concrete & Propping

Heavy structural construction continued with reinforced concrete walls and temporary support systems.

06
06 Structural Floor Construction

06 Structural Floor Construction

Floor structures were formed and supported as the building began to rise above the basement.

07
07 Reinforced Concrete Frame

07 Reinforced Concrete Frame

Reinforced concrete frame, walls and openings established the principal structure of the home.

08
08 Structure Rising

08 Structure Rising

The concrete structure progressed upward, forming the main levels and layout of the property.

09
09 Damp Proofing / External Protection

09 Damp Proofing / External Protection

Damp-proof and waterproof protection was applied to vulnerable external and below-ground areas before surrounding works were completed.

10
10 Brick Superstructure

10 Brick Superstructure

Facing brickwork formed the external envelope around the reinforced concrete structure.

11
11 External Walls & Scaffolding

11 External Walls & Scaffolding

Scaffolding provided access as masonry, openings and external detailing progressed around the property.

12
12 Superstructure Progress

12 Superstructure Progress

The superstructure developed into the recognisable shape of the finished home, with the flat-roof structure and parapets clearly established.

13
13 Flat-Roof Form & Openings

13 Flat-Roof Form & Openings

Brick elevations, structural openings and flat-roof parapets were completed ready for windows, doors and finishing works.

14
14 Windows / External Envelope

14 Windows / External Envelope

Windows and external openings were installed as the building moved toward a weather-tight envelope and internal fit-out.

15
15 Building Services & New Mains

15 Building Services & New Mains

Building services were installed and coordinated through the property, including new electricity, gas and water mains brought in from the road to serve the new home.

16
Architectural concept visualisation of the intended finished property

16 Concept Visualisation

This architectural concept visualisation illustrates the intended finished exterior. It is not a photograph of completed works. The construction-stage photographs elsewhere on this page record actual site progress.

17
17 Completed Interior

17 Completed Interior

The completed interior included the kitchen, fitted cabinetry, island, lighting and final internal works.

PLOT & CONCEPT

Starting point and intended appearance

A photograph of the original plot alongside an architectural concept visualisation.

Blank plot before construction
Before — Blank Plot
Architectural concept visualisation, not a completed-work photograph
Concept — Intended Finished Exterior