ASUKA247
07931 118 247   |   asuka247.uk
← Back to Home
CASE STUDY

Bespoke New-Build Home

From a blank piece of land to a finished property.
ASUKA247 delivered the build through major excavation, double-basement construction, reinforced concrete works, damp proofing and waterproofing, new utility mains from the road, superstructure, external envelope and internal fit-out.

Double Basement
Reinforced Concrete
Damp Proofing
Gas • Electricity • Water
Complete Build & Fit-Out

From Blank Land to Completed Home

Follow the project from site clearance and double-basement construction through waterproofing, structure, services, external works and the completed property.

01

01 Blank Plot

Work began with a blank piece of land, establishing the starting point for the bespoke new-build project.

02

02 Site Clearance & Muck Away

Site clearance, access preparation and removal of excavated material prepared the plot for major groundworks.

03

03 Double Basement / Waterproofing

Major excavation formed the double-basement footprint. Below-ground waterproofing and damp-proof protection were incorporated as the basement works progressed.

04

04 Basement Structure

Reinforced concrete basement walls, slabs and structural elements were formed using temporary works, formwork and propping.

05

05 Reinforced Concrete & Propping

Heavy structural construction continued with reinforced concrete walls and temporary support systems.

06

06 Structural Floor Construction

Floor structures were formed and supported as the building began to rise above the basement.

07

07 Reinforced Concrete Frame

Reinforced concrete frame, walls and openings established the principal structure of the home.

08

08 Structure Rising

The concrete structure progressed upward, forming the main levels and layout of the property.

09

09 Damp Proofing / External Protection

Damp-proof and waterproof protection was applied to vulnerable external and below-ground areas before surrounding works were completed.

10

10 Brick Superstructure

Facing brickwork formed the external envelope around the reinforced concrete structure.

11

11 External Walls & Scaffolding

Scaffolding provided access as masonry, openings and external detailing progressed around the property.

12

12 Superstructure Progress

The superstructure developed into the recognisable shape of the finished home, with the flat-roof structure and parapets clearly established.

13

13 Flat-Roof Form & Openings

Brick elevations, structural openings and flat-roof parapets were completed ready for windows, doors and finishing works.

14

14 Windows / External Envelope

Windows and external openings were installed as the building moved toward a weather-tight envelope and internal fit-out.

15

15 Building Services & New Mains

Building services were installed and coordinated through the property, including new electricity, gas and water mains brought in from the road to serve the new home.

16
Completed bespoke flat-roof brick property

16 Completed Property

From a blank piece of land, the project progressed through excavation, double-basement construction, damp proofing, reinforced concrete structure, brickwork, services and external works to the completed flat-roof home.

17

17 Completed Interior

The completed interior included the kitchen, fitted cabinetry, island, lighting and final internal works.

BEFORE & AFTER

A complete transformation

Blank land to completed bespoke home.

Blank plot before construction
Before — Blank Plot
Completed bespoke property
After — Completed Property

Planning a bespoke build or major property project?

Talk to ASUKA247 about your project.

Call 07931 118 247