Our Delivery Process
One accountable route from problem to completion.
Every project is different, but the control process should not be. Our standard approach creates clear decision points so that safety, cost, access and quality remain managed throughout the job.
01
Pre-start planning and protection
We confirm the agreed scope, access arrangements, working areas, sequencing, relevant hazards and the practical controls needed for the property. Where required, this includes RAMS, COSHH, resident or occupant protection, storage, waste routes and coordination with the client or site team.
02
Controlled initial works
We begin only with the agreed first stage. Depending on the project, this may be removal, opening-up, investigation, access work, isolation, strip-out, inspection or another controlled activity required to reveal the true condition.
03
Inspect and assess what we find
Once the relevant area is exposed or accessible, we assess the condition against the project requirements. We look for issues that could affect safety, compliance, durability, programme, method or cost before moving blindly into the next stage.
04
Hold point: report before proceeding
If we identify concealed damage, unsafe conditions, additional defects, unsuitable materials or another issue that materially changes the work, we stop at the appropriate point and report back. The client can then make an informed decision before additional chargeable work is undertaken.
05
Agree any change to scope
Where extra work, a different repair method, specialist input or additional materials are required, we define the change and obtain approval where appropriate. This protects the client from uncontrolled expenditure and protects the project from undocumented changes.
06
Complete the agreed works
We move into the next stage using competent personnel, suitable materials and the project-specific requirements that apply. Manufacturer instructions, tested systems and applicable regulations or standards are followed where relevant to the work being undertaken.
07
Check, evidence and hand over
We carry out appropriate functional checks, snagging and cleaning, record completion photographs where useful and provide the relevant handover information for the agreed scope. Any outstanding or separately recommended items are identified rather than hidden inside the completed work.
The principle is simple:
We do not treat an unseen condition as known. We expose or inspect what is necessary, assess the evidence, tell you what we have found and then proceed on an agreed basis.